Under-Construction or Ready-to-Move Home in Bangalore: How to Compare

By Bangaloreprop Editorial Team·26 November 2026·6 min read
Under-Construction or Ready-to-Move Home in Bangalore: How to Compare

A home buyer in Bangalore usually chooses between a flat that is still being built and one that is finished and ready to occupy. The two differ in tax, in the cost of waiting, in legal protection and in how much of the home is visible before paying. This guide sets out each difference with the rules behind it and a worked cost example.

The Three Stages of a New Home

New homes are sold at three broad stages, and the stage decides most of what follows:

  • Pre-launch: the developer invites interest before the project is registered with Karnataka RERA.
  • Under construction: the project is registered, work is in progress and homes are sold against a staged payment plan.
  • Ready to move: the building is complete, the occupancy certificate is issued and the home is handed over on full payment.

The first stage carries a legal limit. Section 3 of the Real Estate (Regulation and Development) Act, 2016 bars a promoter from advertising, booking or selling a home before the project is registered. A booking is on firm ground only once the registration number appears on the Karnataka RERA portal.

GST: The Tax Only One of Them Carries

GST applies to a home bought while it is under construction. The rate since 1 April 2019 is 5% of the total price, with no input tax credit for the developer. An affordable home is taxed at 1%, which in Bangalore means a carpet area of up to 60 sq m and a price of up to Rs. 45 Lakhs.

A completed home is treated differently. Under the Central GST Act, a sale is outside GST when the whole price is paid after the completion certificate or after first occupation. A ready flat bought from a developer after the occupancy certificate, or a resale flat bought from an owner, therefore carries no GST.

The timing of payment matters more than the state of the building. A flat booked during construction stays taxable on the instalments paid before completion, even if the building is finished soon after. Stamp duty and registration are charged on both kinds of purchase when the sale deed is registered.

A Worked Cost Example

The example compares an under-construction flat at Rs. 1 Crore with a similar ready flat at Rs. 1.05 Crore. It uses Karnataka stamp duty of 5.6% with cess and surcharge and a 2% registration fee. The figures are an illustration and leave out legal fees, deposits and other small charges.

Cost headUnder constructionReady to move
Agreed priceRs. 1,00,00,000Rs. 1,05,00,000
GST at 5%Rs. 5,00,000Nil
Stamp duty at 5.6%Rs. 5,60,000Rs. 5,88,000
Registration at 2%Rs. 2,00,000Rs. 2,10,000
TotalRs. 1,12,60,000Rs. 1,12,98,000

A price gap of 5% almost disappears once GST is counted. The comparison between two real homes should always be made on the all-in figure and never on the base price alone.

The Cost of Waiting

An under-construction home brings two running costs that a ready home avoids. A buyer who rents keeps paying rent until handover. A rent of Rs. 30,000 a month over a 30-month build adds up to Rs. 9 Lakhs.

The second cost is loan interest during construction. The bank releases the loan in stages, and the buyer pays interest on each released amount well before moving in. A ready home starts the full EMI at once, but that EMI replaces rent from the first month.

The size of the commitment is easy to test. A loan of Rs. 75 Lakhs at 8.5% over 20 years has an EMI of about Rs. 65,087, an illustration based on a Rs. 1 Crore home and the 25% down payment its loan limit requires. The EMI calculator works this out for any price and tenure.

How the Money Is Paid

Payment is where an under-construction home is easier. The price is spread across construction milestones, so the buyer's own contribution and the loan build up over two or three years. A ready home needs the down payment, stamp duty and registration within weeks of the agreement.

RERA limits what a developer may collect early. Section 13 caps the advance at 10% of the cost until a written agreement for sale is signed and registered. Seventy per cent of the money collected from buyers must also go into a separate bank account that covers land and construction costs.

Risk and Legal Protection

The main risk in an under-construction home is delay. Section 18 of the Act gives the buyer two remedies if possession is late: a refund with interest, or interest for every month of delay while staying in the project. In Karnataka the rate is the State Bank of India's highest marginal cost of lending rate plus two per cent.

These remedies reduce the loss from a delay, but they take time to enforce. The completion date declared on the RERA portal and the developer's record on earlier projects remain the best guides. A ready home removes this risk, because the building and its occupancy certificate already exist.

Defects are covered for both. Under section 14(3), a structural or workmanship defect reported within five years of possession must be repaired by the promoter within 30 days, free of charge. Possession itself follows the occupancy certificate, and section 19(10) expects the buyer to take it within two months of that certificate.

What a Buyer Is Able to Inspect

A ready home is bought after seeing the actual flat. The view, daylight, noise, water pressure, lift wait and parking slot are all open to inspection, and so is the occupancy in the building. An under-construction home is chosen from plans, a model flat and the site as it looks on the day.

The trade-off is choice. A buyer who books at launch picks from every floor, facing and layout, while a completed project often has only the remaining homes. A finished building may also be a few years old by the time its last flats sell, so the age of lifts, pumps and paintwork deserves a look.

Which Buyer Each One Suits

A ready home fits a buyer who needs to move within a few months, pays rent today and has the down payment in hand. The total cost is known on day one, and the rent stops when the EMI starts. It also suits a buyer who prefers to judge a finished building over a promise.

An under-construction home fits a buyer who is still building savings and plans to move in two or three years. The staged payments, wider choice and newer design are the gains, and the waiting cost and delay risk are the price. A project close to completion offers a middle path, with a short wait and most of the building visible.

Checks Before Paying

For an under-construction home, these checks come first:

  • The RERA registration number, promoter name and declared completion date on the Karnataka RERA portal.
  • The quarterly progress updates filed for the project.
  • A payment plan tied to construction stages, with GST shown as a separate line in the cost sheet.
  • The developer's handover record on earlier projects in the city.

For a ready home, the list is different:

  • The occupancy certificate for the block that holds the flat.
  • The khata, the latest property tax receipt and an encumbrance certificate.
  • Water and electricity connections in the building's name, and the monthly maintenance charge.
  • Confirmation in writing that the full price is payable after the occupancy certificate, which keeps the sale outside GST.

Frequently Asked Questions

Is GST charged on a ready-to-move flat?+
No. A sale is outside GST when the whole price is paid after the completion certificate or first occupation. An under-construction flat carries GST of 5% of the price, or 1% for an affordable home.
Is an under-construction flat always cheaper than a ready flat?+
The base price is usually lower, but GST, rent during construction and loan interest before handover narrow the gap. Comparing the all-in cost of two real homes gives the true difference.
What happens if an under-construction project is delayed?+
Section 18 of the RERA Act lets the buyer withdraw with a refund and interest, or stay and receive interest for every month of delay. In Karnataka the rate is the State Bank of India's highest marginal cost of lending rate plus two per cent.
Does a ready-to-move flat have a builder warranty?+
Yes, in a RERA project. A structural or workmanship defect reported within five years of possession must be repaired by the promoter within 30 days, free of charge, under section 14(3) of the Act.
Is it safe to book a pre-launch flat in Bangalore?+
A booking is on firm ground only after RERA registration. Section 3 of the Act bars a promoter from advertising, booking or selling a home before the project is registered with Karnataka RERA.