Birla Trimaya in Devanahalli: Buyer's Guide (October 2026)

Birla Trimaya is a 52-acre residential township by Birla Estates on Shettigere Main Road in Devanahalli, North Bangalore. It is being built in four RERA-registered phases with 2,028 homes in all, and the newest phase is priced from Rs. 90 Lakhs. This guide covers the location, the phases and their dates, the homes and prices, and the checks to run before booking.
Who the Project Suits
Birla Trimaya is for buyers who want a township home close to Kempegowda International Airport. It suits people who work at the airport or in the business parks around it, frequent flyers, and NRI buyers who prefer a large national developer. The mix runs from 1 BHK homes for investors to 4 BHK duplex homes for large families.
The registered completion dates run from October 2028 to December 2031, so the project rewards buyers who are able to wait. Offices in Whitefield, on the Outer Ring Road and in Electronic City are a long drive from Devanahalli. A buyer with a daily commute to those areas should test the route at peak hour before deciding.
Location and Connectivity
Birla Trimaya is located at Property No. 103, Shettigere Main Road, in Akkalenahalli-Mallenahalli village, Kasaba Hobli, Devanahalli Taluk, Bengaluru Rural district, pincode 562110. The site borders Shettigere village on its southern side. Kempegowda International Airport is the nearest landmark, and the drive to the terminals goes around the airport land.
These links shape travel from the township:
- Bellary Road (NH 44), the main highway from the airport belt to Hebbal and the city
- Shettigere Main Road, the local road between the highway and the site
- Prestige Tech Cloud, a business park 2.5 km from the project
- The airport Blue Line metro, which is under construction, with a station planned at Doddajala on Bellary Road
Schools, hospitals and larger shops are in Devanahalli town and along Bellary Road towards Yelahanka. A mall is also planned 2 km from the project. The metro is the main improvement still to come, and until it opens the township depends on road travel.
The Four Phases
Each phase of Birla Trimaya has its own RERA number, its own towers and its own completion date. The developer markets the township in clusters named The Hill, The Park and The Bay, and The Bay is the Phase 4 release. The registered phases are as follows:
| Phase | RERA approval | Homes | Buildings | Completion date |
|---|---|---|---|---|
| Phase 1 | 30 August 2023 | 544 | Seven towers of 11 to 12 floors and one 3-floor block | 31 October 2028 |
| Phase 2 | 4 September 2024 | 473 | Five towers of 12 to 13 floors, duplex blocks and row houses | 20 June 2029 |
| Phase 3 | 30 January 2025 | 463 | Five towers of 12 to 14 floors and one 3-floor block | 31 August 2030 |
| Phase 4 | 29 January 2026 | 548 | Seven towers of 14 floors | 15 December 2031 |
The towers are mid-rise, with one or two basements for parking. Phase 2 also holds 28 low-rise duplex apartments and 9 row houses, which are the largest homes in the township. The 548 homes of Phase 4 are made up of 58 one-bedroom, 250 two-bedroom, 226 three-bedroom and 14 four-bedroom homes.
Homes and Prices
Birla Trimaya prices in the newest phase start at Rs. 90 Lakhs for a 1 BHK and go up to Rs. 4.24 Crore for a duplex home. Prices by home type are as follows:
- 1 BHK of about 485 sq ft: from Rs. 90 Lakhs
- 2 BHK of about 801 sq ft: from Rs. 1.34 Crore
- 3 BHK of about 1,100 sq ft with three bathrooms: from Rs. 1.75 Crore
- 4 BHK duplex of about 2,551 sq ft with a maid's room: from Rs. 4.24 Crore
The price per sq ft works out to about Rs. 15,900 for the 3 BHK and about Rs. 18,600 for the 1 BHK. Carpet areas in the Phase 4 registration are about 445 sq ft for the 1 BHK and 735 to 745 sq ft for the 2 BHK. The 3 BHK homes have 963 to 1,084 sq ft of carpet area, so the cost sheet should state the carpet area of the chosen home.
Other costs are added to the base price. Stamp duty above Rs. 45 Lakhs is 5.6% with cess and surcharge, and registration is 2%. On a Rs. 90 Lakhs home the two come to about Rs. 6.84 Lakhs. GST, floor rise, parking, club charges and the maintenance deposit are extra, so ask for one written figure that includes them all.
As an illustration, a Rs. 90 Lakhs home with a 20% down payment needs a loan of Rs. 72 Lakhs. At 8.5% a year over 20 years, the EMI is about Rs. 62,500 a month. The EMI calculator shows the figure for any other price.
Master Plan and Amenities
The Birla Trimaya master plan keeps 73% of the 52-acre site as open space. A water body of about 2.5 acres is the central feature, with the towers arranged in clusters around the landscaped areas. More than 30 amenities are planned across the township.
The main amenities include:
- A clubhouse with a gymnasium, a swimming pool and indoor games
- Lawn tennis and other sports courts
- A skating rink and children's play areas
- Jogging tracks, gardens and a picnic area around the lake
- Retail space inside the site for daily shopping
In a phased township the shared amenities arrive in stages. Ask which clubhouse and which open areas are tied to the phase on offer, and when they are due. The answer matters most for buyers in the earliest towers, who move in while later phases are still under construction.
RERA and Approvals
Birla Trimaya is RERA approved in four phases, and the promoter on each registration is Birla Arnaa LLP. The numbers are PRM/KA/RERA/1250/303/PR/300823/006200 for Phase 1 and PRM/KA/RERA/1250/303/PR/040924/006988 for Phase 2. Phase 3 is PRM/KA/RERA/1250/303/PR/300125/007458 and Phase 4 is PRM/KA/RERA/1250/303/PR/290126/008436.
The building plans were approved by the Bangalore International Airport Area Planning Authority. Phase 4 has a registered start date of 20 November 2026, so its towers are at the earliest stage. Phase 1 has a registered start date of 1 November 2023 and is the closest to handover. Each number can be checked on the Karnataka RERA portal, along with the quarterly progress updates for that phase.
About the Developer
Birla Estates is the real estate business of the Aditya Birla Group, with projects in Bangalore, Mumbai, Pune and the National Capital Region. Its other Bangalore projects include Birla Alokya, Birla Tisya, Birla Ojasvi and Birla Evara. The company is a wholly owned subsidiary of Aditya Birla Real Estate, a listed company.
Checks Before Booking
A township sold in phases needs a few extra checks. These cover the main points:
- Ask which phase and tower the home belongs to, and match that phase's RERA number on the portal
- Read the completion date on the registration against the date in the agreement for sale
- Ask for a full cost sheet with the carpet area, GST, floor rise, parking and deposits
- Check the latest quarterly update on the portal for the stage of the tower
- Confirm which amenities are part of the phase and when they will open
- Drive the route to work at peak hour, with and without the airport traffic
- Ask two banks whether the phase is approved for home loans