Bangaloreprop

Sattva Songbird Phase 2 in Budigere: Buyer's Guide (October 2026)

By Bangaloreprop Editorial Team·20 November 2026·6 min read
Sattva Songbird Phase 2 in Budigere Cross

Sattva Songbird Phase 2 is a new launch apartment project by Sattva Group in Cheemasandra, on Budigere Road off Old Madras Road, East Bangalore. It received its RERA registration on 27 March 2026. This guide covers who the project suits, the location, the towers and homes, prices, the RERA position and the checks before booking.

Who the Project Suits

Sattva Songbird Phase 2 adds 381 homes of 2 and 3 BHK in two towers on about 4.13 acres, next to the first phase of Sattva Songbird. It suits a couple or a family that works around Whitefield or KR Puram and wants a home on a high floor. Prices start at Rs. 1.55 Crore, and the registered completion date is 27 June 2031.

The wait is long, at close to five years from October 2026. A buyer who needs to move in soon, or who wants a studio or a 1 BHK, is better served elsewhere. The first phase, Sattva Songbird, has the smaller home types and an earlier registered completion date of May 2029.

Location and Connectivity

The exact location of Sattva Songbird Phase 2 is Survey Nos. 15/1, 15/2, 15/3 and 15/5, Cheemasandra village, Bidarahalli Hobli, Bangalore East Taluk, pincode 560049. The land adjoins the first phase on its eastern side. NH 75, known as Old Madras Road, is a short drive away through Budigere Cross.

The Purple Line of Namma Metro runs to Whitefield (Kadugodi), and that station is the nearest one to the project. The Peripheral Ring Road is planned to pass close to Cheemasandra. Until it is built, travel towards Whitefield and KR Puram depends on Old Madras Road and Budigere Road.

The distances from the project by road are listed below:

  • Whitefield Railway Station: 7.2 km
  • Whitefield (Kadugodi) Metro Station: 7.5 km
  • KR Puram Metro Station: 10.3 km
  • Kempegowda International Airport: 24.8 km

Towers and Homes

Sattva Songbird Phase 2 has two towers of very different heights. Tower 5 has two basements, a ground floor and 42 upper floors, rises to about 136 metres and holds 338 homes. Tower 6 has three basements, a ground floor and seven upper floors, and holds 43 homes.

Most floors of Tower 5 carry eight homes, so ask how many lifts serve each floor. The parking plan has 457 car spaces, of which 443 are covered. The registered home types and their sizes are shown in the table.

Home TypeHomesCarpet area (sq ft)Saleable area (sq ft)Starting price
2 BHK125785 to 8321,285 and 1,340Rs. 1.55 Crore
3 BHK, two bathrooms213975 to 1,0491,564 to 1,660Rs. 1.87 Crore
3 BHK, three bathrooms431,060 to 1,098Up to 1,814Price on request

Carpet area is the space inside the walls of the home. The saleable area used for pricing adds balconies and a share of the common areas, and carpet area is a little over 60% of it. Ask for both figures for the exact home before comparing rates with other projects.

The phase has its own main clubhouse of 20,188 sq ft and a smaller satellite clubhouse of 5,519 sq ft. The amenities include a swimming pool, a gym, two badminton courts, a pickleball court, a cricket pitch, a pet park and play areas for children. In all, more than 40 amenities are planned.

Prices and Other Costs

Sattva Songbird Phase 2 prices start at Rs. 1.55 Crore for a 2 BHK of 1,285 sq ft and Rs. 1.61 Crore for the 1,340 sq ft plan. The 3 BHK homes with two bathrooms start at Rs. 1.87 Crore, Rs. 1.93 Crore and Rs. 1.98 Crore by size. The price per sq ft is about Rs. 12,000 on saleable area.

In a tower of 42 floors, the floor chosen moves the price a good deal. A buyer of a home under construction pays these costs over the agreement value:

  • GST on the agreement value
  • Stamp duty and registration (in Karnataka, stamp duty above Rs. 45 Lakhs is 5% plus cess and surcharge, and registration is 2%)
  • Floor-rise and view premiums
  • Clubhouse charges, the maintenance deposit and any extra car park

On a Rs. 1.55 Crore home, stamp duty and registration come to about Rs. 11.8 Lakhs. Our EMI calculator shows the monthly instalment for the planned loan. A buyer who pays rent during construction should add close to five years of rent to the budget.

RERA, Possession and Stage of Work

Sattva Songbird Phase 2 RERA registration number is PRM/KA/RERA/1251/310/PR/270326/008557, granted on 27 March 2026 to Sattva Resi Private Limited, a Sattva Group company. The Bangalore Development Authority approved the building plan on 27 February 2026. The number can be checked on the Karnataka RERA portal under the registered name, Sattva Songbird Ph 2.

The registered start date is 1 May 2026 and the registered completion date is 27 June 2031. The quarterly update filed in July 2026 put overall progress at 3%, so the work is at an early stage. The registered completion date is the one that binds the seller, whatever date a sales team quotes.

Two points in the registration deserve a question before booking. A civil suit on the land, number 941 of 2026, is pending before a civil court for Bangalore Rural district, and no stay or injunction has been issued. Water is planned from borewells, so ask what the backup is for the summer months.

About the Developer

Sattva Group, earlier known as Salarpuria Sattva, is a Bangalore developer that has been building since 1993. Its work covers apartments, plotted layouts, office parks and malls. The first phase of Sattva Songbird next door, with four towers and 58 row houses on 12 acres, shows the build quality as its structure rises.

Checks Before Booking

A tall tower with a long build period rewards a careful start. These checks cover the main points for Sattva Songbird Phase 2:

  • Match the tower and the flat number to the RERA registration on the Karnataka RERA portal
  • Ask for the carpet area, the balcony area and the saleable area of the exact home in writing
  • Ask for the latest order sheet of the civil suit and the lawyer's title opinion
  • Ask for the floor-wise price list, and compare a mid floor with a high floor
  • Count the lifts in Tower 5 against eight homes a floor, and ask about the fire refuge floors
  • Drive from the gate to the workplace at the usual office hour and time the trip
  • Pay only into the project account named in the RERA registration

Availability changes by tower and floor as bookings progress. Ask us for the homes open at Sattva Songbird Phase 2 and the latest price sheet.

Frequently Asked Questions

Is Sattva Songbird Phase 2 RERA approved?+
Yes. The Karnataka RERA number is PRM/KA/RERA/1251/310/PR/270326/008557, granted on 27 March 2026 to Sattva Resi Private Limited, a Sattva Group company. The registered name on the portal is Sattva Songbird Ph 2.
What is the price of Sattva Songbird Phase 2?+
A 2 BHK starts at Rs. 1.55 Crore and a 3 BHK at Rs. 1.87 Crore, before GST, stamp duty and registration. The price is about Rs. 12,000 per sq ft and changes with the floor.
Where is Sattva Songbird Phase 2 located?+
It is in Cheemasandra village on Budigere Road, off Old Madras Road, pincode 560049, next to the first phase of Sattva Songbird. Whitefield (Kadugodi) Metro Station is 7.5 km away.
When will Sattva Songbird Phase 2 be completed?+
The registered completion date is 27 June 2031. Work started in May 2026, and the quarterly update filed in July 2026 put overall progress at 3%.
How many towers and homes does Sattva Songbird Phase 2 have?+
Two towers with 381 homes: 125 two-bedroom and 256 three-bedroom apartments. Tower 5 has 42 upper floors and 338 homes, and Tower 6 has seven upper floors and 43 homes.