Prestige Suncrest in Electronic City: Buyer's Guide (October 2026)

Prestige Suncrest is an under-construction apartment project by Prestige Group on Jigani Road in the Electronic City belt of South Bangalore. Two towers hold 437 homes, and the smaller plans have already sold out with the developer. This guide sets out the registered facts, the homes and prices still on sale, the location, the construction stage and the checks to finish before booking.
Project Facts at a Glance
The main facts of the project, as registered with Karnataka RERA, are in the table below:
| Item | Detail |
|---|---|
| Promoter | Prestige Estates Projects Ltd |
| Type | Residential apartments |
| Land area | 23,738 sq m, about 5.9 acres |
| Homes | 437 |
| Towers | Tower 1 with 26 floors and 224 homes, Tower 2 with 25 floors and 213 homes |
| Address | Sy. No. 30/24B, 30/24C, 30/25A1 (part) and 30/25B, Tirupalya Village, Jigani Hobli, Anekal Taluk, Bengaluru Urban 560099 |
| RERA number | PRM/KA/RERA/1251/308/PR/170225/007512 |
| Building plan approval | Bangalore Development Authority (BDA), 15 January 2025 |
| Construction period | 1 April 2025 to 30 September 2028 |
The two towers cover 9,237 sq m of the land, and 14,501 sq m is open area. That is 61% of the site. The project has 580 covered and 33 open parking spaces, and each tower has one basement.
Location and Connectivity
Prestige Suncrest is located at Tirupalya Village on Jigani Road, pincode 560099. The site is in the industrial and office belt that runs from Electronic City to Bommasandra. Offices in both phases of Electronic City are a short commute away.
The Yellow Line of Namma Metro opened in August 2025 and runs from RV Road through Electronic City to its terminus at Bommasandra. The nearest stations are a short drive from the site. Hosur Road (NH 44) and its elevated expressway connect the area to Silk Board and the rest of the city.
The surroundings are a working industrial area, with factories along Jigani Road. A visit on a weekday, in the morning and again in the evening, shows the traffic and the character of the neighbourhood.
Homes and Sizes
Prestige Suncrest was planned with 49 one-bedroom, 96 two-bedroom and 292 three-bedroom apartments. The plans, their sizes and their current status are shown below:
| Home Type | Carpet area (sq ft) | Built-up area (sq ft) | Status |
|---|---|---|---|
| 1 BHK | 420 to 444 | 661 and 691 | Sold out |
| 2 BHK | 707 to 757 | 1,222 | Sold out |
| 3 BHK, two bathrooms | 884 to 925 | 1,452 | Sold out |
| 3 BHK, three bathrooms | 1,045 to 1,108 | 1,757 | From Rs. 1.89 Crore |
| 3 BHK, three bathrooms and home office | 1,137 to 1,155 | 1,953 | From Rs. 2.10 Crore |
The price per sq ft is about Rs. 10,800 on both plans that remain on sale. The home office plan adds a separate work room to the three-bedroom layout. The sold-out plans may come up later as resale bookings from earlier buyers.
Stamp duty and registration are paid on top of the price. On a Rs. 1.89 Crore home, stamp duty at 5.6% and the registration fee at 2% add about Rs. 14.4 Lakhs. GST also applies to a home bought during construction, and our EMI calculator shows the monthly outgo and the upfront cash.
Amenities
Amenities at Prestige Suncrest are planned around a clubhouse and the open ground between the two towers. The main facilities include the following:
- A clubhouse with a gymnasium, an indoor games zone and a mini theatre
- A swimming pool, a yoga zone, and a salon and spa
- Sports courts and a jogging track
- A children's play area and a pet park
- Landscaped gardens, a party area and retail spaces
The clubhouse and the outdoor sports facilities are part of the registered project. The agreement should list the amenities that will be ready at handover.
RERA Status and Construction Stage
Prestige Suncrest is RERA approved, with a registration dated 17 February 2025. The registered completion date is 30 September 2028. The quarterly update submitted in July 2026 shows the foundation and plinth complete, the basement at 30% and the tower structure at 9%.
The registration number can be checked on the Karnataka RERA portal by searching the project name. The portal carries the approved plans, the unit list with each flat's carpet area, and the quarterly progress reports. Reading the latest report before booking shows how far the towers have risen.
Who the Project Suits
The project suits a family, or a couple working in Electronic City, that wants a large three-bedroom home with three bathrooms and can wait until late 2028. The home office plan fits a buyer who works from home on some days. Pet owners gain from the pet park in the plan.
The budget starts at Rs. 1.89 Crore for the homes that remain. A buyer who wants a 1 BHK or 2 BHK, or who needs to move in soon, will be better served by a resale booking or by another project in the area.
Checks Before Booking
The checks below cover the points that matter most for an under-construction home:
- Match the flat number, carpet area and parking in the agreement with the RERA unit list
- Note the possession date in the agreement and the compensation clause for delay
- Get the full cost sheet, with the floor rise, electricity and water charges, maintenance advance and corpus fund
- Ask about the water supply, which is registered as borewell and local body supply
- Check the tower, floor and facing against the site plan, and the distance from Jigani Road
- Confirm which banks have approved the project for home loans
- Pay only into the RERA-designated project account
Buyers comparing options in the area can also look at other apartments for sale in Electronic City. We can share the current price list, floor plans and availability for Prestige Suncrest on request.


